Delivery & Setup, Done Right

Free within 50 miles. Scheduled, level, and placed exactly where you want it.

How Our Delivery Works

We’ll schedule a time that fits your calendar, confirm access, and bring your building on a tilt-trailer. On site, our mule positions the building precisely; we level it and check doors & windows before we leave.

Delivery
Site Prep

Choose gravel/concrete and make it level.

Schedule

We confirm date, route, and access.

Delivery Day

We arrive and unload carefully.

Precise Placement

Mule positions your building exactly.

Final Walkthrough

Leveling check before we leave.

Free Delivery Within 50 Miles

Customers within 50 miles of our sales lot receive free delivery & setup. Outside the zone? We’re happy to deliver—ask for a mileage quote.

Free delivery (click to enlarge)

Installation Prep

A level pad is essential for doors and windows to operate correctly. Most customers use compacted gravel; concrete pads are great too—just keep the surface level and unobstructed.

Compacted, gravel pad

Compacted Gravel Pad

  • 3—4″ compacted gravel; extend pad beyond the building footprint
  • Drains well and resists front heave
  • Budget-friendly and fast to install
Concrete slab

Concrete Slab

  • Durable, clean suface for workshops/garages
  • Ensure slab is level; avoid raised edges/lips
  • Plan anchor points if required

If you have questions about pad size or placement, we’ll review your site photos and advise what works best.

4″ × 6″ Skid Placement
Offsets from building corner to skid centerlines (based on actual floor size; trim/overhang not included)
Building width Outer skids — offset from each side Inner skids — offset from each side Total skids
8′ wide 15″ — (No inner skids) 2
10′ wide 3½″ 27″ 4
12′ wide 7½″ 39″ 4
14′ wide 7½″ 51″ 4
16′ (180″) wide 7½″ 57″ 4
Notes: Measure in from both long sides to the offsets above (to skid centerlines) so skids are parallel.

Access & Placement Checklist

  • Clear path of low branches & overhead lines
  • Firm ground or drive to the site (weather permitting)
  • Gate/drive openings wide enough for the building & equipment
  • Mark utilities, septic, and sprinklers
  • Remove obstacles where the building will sit
  • Have someone on-site to confirm final placement

Ready to plan your building?

Request a quick quote or give us a call.

Request a Quote
Browse Products

Prefer to talk? (660) 414-0426